Final pictures of the bathroom and laundry room flip/remodel...
Before & after pics
Pictures of the journey - 34 working days over 8 calendar weeks (started building cabinets July 11th and started on site demo two weeks later)
Old laundry room / new full bath transformation
Our arrival, looking at what Jeff had already removed.
Removing panels from walls
Pulling up linoleum
Prying up subfloor
Frame for new trap door into crawl space, in the hallway
Reinforced floor for new tub
Rewired, reinsulated, new subfloor, studded up walls
Green board up & mudded; installing new pocket door frame
Durock, shower shelf, and tub installed
Greenboard left open, behind linen cabinet, for easy access to shower & bath plumbing; new fan installed; light & fan switches installed
More mudding
Shower shelves tiled
Shower and bathroom floor tiled
Floor left open under hot water heater for easier access to plumbing and gas lines
Shower and bathroom floor grouted; floor sealed; vanity & mirrored medicine cabinet installed
Hot water heater surround installed
Pocket door installed - ready for plumber to hook up sink and shower!
Old bathroom / new laundry room & half bath transformation
Next was demo day of the old bathroom - we needed to completely demo in order for plumber to gain access to the sewer line for the new toilet installation...
Removing bathtub & shower wall liners
Liner was thick and hard to remove
Yuk!
Last piece of liner!
Tub out and starting on removing tile floor - 1" of mortar to get out.
Sheetrock coming down
Masks required!
Where tub & shower used to be
Where toilet used to be
Lower corner was all rotted out
Where vanity used to be
What?! The toilet was sitting on a concrete slab!
Hmmm - newspapers in the concrete form
May 17, 1964!
Forms removed - need to bust away concrete to get to the sewer pipe
Found rotted floor joist inside the concrete slab - I guess that's one way to fix a bad floor.
Sewer pipe revealed - yeah!
Nothing holding up that corner now
Rotted out portion of joist removed
John busting up sewer connection so toilet can be lowered 1"
Sewer connection removed
New toilet plumbed and hooked up into the sewer system!
All in a day's very hard work!
The next day, rotted out corner was rebuilt with new pressure treated floor joists, studs, a little Tyvek and pressure treated plywood
Before & after of rotted out corner...
New dedicated 20amp circuit added for laundry room
Nailer bar for hanging mirror
New vanity plumbing and HVAC duct under vanity
New toilet plumbing and HVAC duct running towards kitchen plumbing to help keep pipes warm in the winter
Main water shut-off valve still located in crawl space - pretty much right in front of vanity sink drain pipe
Vent pipe for toilet in full bath is running into vent pipe for vanity in laundry room
Subfloor just about all put back together
Sheetrock up
Drain hoses for hot water heater and air conditioner come up through floor and drain into washer OxBox drain
Mudding begins
Durock on floor
Mudding the ceiling
Primed, painted, and tile installed
Temporary walkways to bathroom and bedroom while tile sets up overnight
Grouting hallway & laundry room floor
Installed linen cabinet, door jambs, and trim
Installed light, outlets, and heat vent in vanity (vanity had to be removed to get washer & dryer into the room)
Installed cabinets, washer, dryer, and shelf
Installed toilet and vanity
Installed new bedroom door
Installed new laundry room door & sealed the floor
DONE!!
Rendering pic and layout of new bathroom