Final pictures of the bathroom and laundry room flip/remodel...
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture

Before & after pics
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture


Pictures of the journey - 34 working days over 8 calendar weeks (started building cabinets July 11th and started on site demo two weeks later)

Old laundry room / new full bath transformation

Picture
Our arrival, looking at what Jeff had already removed.

Picture
Removing panels from walls

Picture
Pulling up linoleum

Picture
Prying up subfloor

Picture
Frame for new trap door into crawl space, in the hallway

Picture
Reinforced floor for new tub

Picture
Rewired, reinsulated, new subfloor, studded up walls

Picture
Green board up & mudded; installing new pocket door frame

Picture
Durock, shower shelf, and tub installed

Picture
Greenboard left open, behind linen cabinet, for easy access to shower & bath plumbing; new fan installed; light & fan switches installed

Picture
More mudding

Picture
Shower shelves tiled

Picture
Shower and bathroom floor tiled

Picture
Floor left open under hot water heater for easier access to plumbing and gas lines

Picture
Shower and bathroom floor grouted; floor sealed; vanity & mirrored medicine cabinet installed

Picture
Hot water heater surround installed

Picture
Pocket door installed - ready for plumber to hook up sink and shower!


Old bathroom / new laundry room & half bath transformation

Next was demo day of the old bathroom - we needed to completely demo in order for plumber to gain access to the sewer line for the new toilet installation...
Picture
Picture
Removing bathtub & shower wall liners

Picture
Liner was thick and hard to remove

Picture
Yuk!

Picture
Last piece of liner!

Picture
Tub out and starting on removing tile floor - 1" of mortar to get out.

Picture
Sheetrock coming down

Picture
Masks required!

Picture
Where tub & shower used to be

Picture
Where toilet used to be

Picture
Lower corner was all rotted out

Picture
Where vanity used to be

Picture
What?!  The toilet was sitting on a concrete slab!

Picture
Hmmm - newspapers in the concrete form

Picture
May 17, 1964!

Picture
Forms removed - need to bust away concrete to get to the sewer pipe

Picture
Found rotted floor joist inside the concrete slab - I guess that's one way to fix a bad floor.

Picture
Sewer pipe revealed - yeah!

Picture
Nothing holding up that corner now

Picture
Rotted out portion of joist removed

Picture
John busting up sewer connection so toilet can be lowered 1"

Picture
Sewer connection removed

Picture
New toilet plumbed and hooked up into the sewer system!

Picture
All in a day's very hard work!

Picture
The next day, rotted out corner was rebuilt with new pressure treated floor joists, studs, a little Tyvek and pressure treated plywood

Before & after of rotted out corner...
Picture
Picture
New dedicated 20amp circuit added for laundry room

Picture
Nailer bar for hanging mirror

Picture
New vanity plumbing and HVAC duct under vanity

Picture
New toilet plumbing and HVAC duct running towards kitchen plumbing to help keep pipes warm in the winter

Picture
Main water shut-off valve still located in crawl space - pretty much right in front of vanity sink drain pipe

Picture
Vent pipe for toilet in full bath is running into vent pipe for vanity in laundry room

Picture
Subfloor just about all put back together

Picture
Sheetrock up

Picture
Drain hoses for hot water heater and air conditioner come up through floor and drain into washer OxBox drain

Picture
Mudding begins

Picture
Durock on floor

Picture
Mudding the ceiling

Picture
Primed, painted, and tile installed

Picture
Temporary walkways to bathroom and bedroom while tile sets up overnight

Picture
Grouting hallway & laundry room floor

Picture
Installed linen cabinet, door jambs, and trim

Picture
Installed light, outlets, and heat vent in vanity (vanity had to be removed to get washer & dryer into the room)

Picture
Installed cabinets, washer, dryer, and shelf

Picture
Installed toilet and vanity

Picture
Installed new bedroom door

Picture
Installed new laundry room door & sealed the floor

Picture
DONE!!


Rendering pic and layout of new bathroom 
Picture
Picture
Picture
  • Home
  • About Us
  • KITCHENS
  • BEDROOMS
  • BATHROOMS
  • FIREPLACES
  • GARAGES
  • CLOSETS
  • BARN DOORS
  • MUDROOMS
  • MURPHY BEDS
  • BOOKCASES
  • FURNITURE
  • STORAGE SOLUTIONS
  • RENDERINGS